Project ZF – Office Block
Contractor: SDC Construction
Duration: 12
Location: Solihull
Package: SFS
Value: £400,000
Project ZF comprised of a new ultra-modern office facility including manufacturing facility adjacent to it.
Working with Design Engine as the SFS designer, the SFS was complex in places in order to support the long ribbon windows in the external façade.
A large number of hot rolled windposts were installed to stabilise the framework above and below these ribbons.
The final product looks superb, this was a really interesting project to assist with.